Test subject | Code of the standard | Name of the standard | Tested parameters | * Beginning of the project | ** Acceptance of applications till | *** End of the project |
---|---|---|---|---|---|---|
Asphalt mixtures | EN 12697-6:2012, Procedure В | Bituminous mixtures – Test methods for hot mix asphalt – Part 6: Determination of bulk density of bituminous specimens. | Bulk density /ua/ | 16.01.2017 | 17.03.2017 | 30.07.2017 |
EN 12697-5:2009, Procedure А | Bituminous mixtures – Test methods for hot mix asphalt – Part 5: Determination of the maximum density. | Maximum density /ua/ | ||||
EN 12697-8:2003, clause 4 | Bituminous mixtures – Test methods for hot mix asphalt – Part 8: Determination of void characteristics of bituminous specimens. | Air voids content /ua/ | ||||
EN 12697-34:2012 | Bituminous mixtures – Test methods for hot mix asphalt – Part 34: Marshall test. | Stability /ua/ | ||||
EN 12697-34:2012 | Bituminous mixtures – Test methods for hot mix asphalt – Part 34: Marshall test. | Flow /ua/ | ||||
EN 12697-1:2012 | Bituminous mixtures – Test methods for hot mix asphalt – Part 1: Soluble binder content. | Soluble binder content /ua/ | ||||
Cement | EN 196-1:2016 | Methods of testing cement – Part 1: Determination of strength. | Determination of strength /ua/ | |||
EN 196-3:2016 | Methods of testing cement – Part 3: Determination of setting times and soundness. | Determination of setting times /ua/ | ||||
EN 196-3:2016 | Methods of testing cement – Part 3: Determination of setting times and soundness. | Determination of soundness /ua/ | ||||
EN 196-3:2016 | Methods of testing cement – Part 3: Determination of setting times and soundness. | Standard consistency /ua/ |
- “Invitation for participation” (QF 4.4-3) in МС 02/2017;
- “Application form” (QF 4.4-4) for МС 02/2017;
Legend:
* The date which is pointed as a beginning of the relevant project is the date when acceptance of the applications starts.
** Application forms for the relevant project in English and Bulgarian may be found in the “ILC” section on our webpage: http://www.ptprovider.sslsb.org/
*** The end of the relevant project means that this is the deadline for the report to be prepared in case nothing else is stated in the instruction form QF 4.4-5.
/ua/ Under accredtitation (covered by the scope of accreditation)
/оа/ Out of accreditation (not covered by the scope of accreditation)