Home / PT Schemes / Interlaboratory Technical Project МС 03/2022 (Completed)

Dear Colleagues,

PT provider UCLSB invites you to take part in Interlaboratory Technical Project MC 03/2022. Test subjects will be: Filler and Concrete products – Concrete paving blocks, according to the pointed standards and parameters in the following table:

Test subjectCode of the standardName of the standardTested parameters (characteristics)
FillerEN 933-1Tests for geometrical properties of aggregates - Part 1: Determination of particle size distribution - Sieving method.Particle size distribution /ua/
EN 933-9Tests for geometrical properties of aggregates - Part 9: Assessment of fines - Methylene blue test.Assessment of fines – Methylene blue test /ua/
EN 1097-7Tests for mechanical and physical properties of aggregates - Part 7: Determination of the particle density of filler - Pyknometer method.Particle density of filler – Pyknometer method /ua/
EN 1744-1, clause 7Tests for chemical properties of aggregates - Part 1: Chemical analysisWater-soluble chloride salts /ua/
EN 1744-1, clause 12Tests for chemical properties of aggregates - Part 1: Chemical analysisAcid soluble sulfates /ua/

/ua/ - under accreditation, within the scope of accreditation of the PT provider; /oa/ - out of the scope of accreditation of the PT provider

Test subjectCode of the standardName of the standardTested parameters (characteristics)
Concrete products – Concrete paving blocksEN 1338:2003, Annex FConcrete paving blocks - Requirements and test methodsTensile splitting strength /ua/
EN 1338, Annex FConcrete paving blocks - Requirements and test methodsFailure load /ua/
EN 1338, Annex EConcrete paving blocks - Requirements and test methodsWater absorption /ua/

/ua/ - under accreditation, within the scope of accreditation of the PT provider; /oa/ - out of the scope of accreditation of the PT provider

  • “Invitation for participation” (QF 4.4-3) in MC 03/2022;
  • “Application form” (QF 4.4-4) for MC 03/2022;
  • Detailed plan for proficiency testing (QF 4.4-1) for MC 03/2022;

Legend:

* The date which is pointed as a beginning of the relevant project is the date when acceptance of the applications starts.

** Application forms for the relevant project in English and Bulgarian may be found in the “PT Schemes” section on our webpage: http://www.ptprovider.sslsb.org/

*** The end of the relevant project means that this is the deadline for the report to be prepared in case nothing else is stated in the instruction form QF 4.4-5.

/ua/ Under accredtitation (covered by the scope of accreditation) /оа/ Out of accreditation (not covered by the scope of accreditation)

Note: All participants will receive further instructions for the process of implementing the relevant PT scheme. The minimum number of participants for a parameter to be included in the relevant PT scheme is 5.