Dear Colleagues,
PT provider UCLSB invites you to take part in Interlaboratory Technical Project MC 06/2023. Test subjects will be: Bitumen, according to the pointed standards and parameters (characteristics) in the following table:
Test subject | Code of the standard | Name of the standard | Tested parameters (characteristics) |
---|---|---|---|
Bitumen and bitumen products | EN 1426 | Bitumen and bituminous binders - Determination of needle penetration. | Needle penetration /ua/ |
EN 1427 | Bitumen and bituminous binders - Determination of the softening point - Ring and Ball method. | Softening point - Ring and Ball method /ua/ | |
EN 12593 | Bitumen and bituminous binders - Determination of the Fraass breaking point. | Fraass breaking point /ua/ | |
EN ISO 2592 | Petroleum and related products - Determination of flash and fire points - Cleveland open cup method (ISO 2592). | Flash point /ua/ | |
EN 15326 | Bitumen and bituminous binders - Measurement of density and specific gravity - Capillary-stoppered pyknometer method. | Density /ua/ | |
EN 12592 | Bitumen and bituminous binders - Determination of solubility. | (Determination of) Solubility /ua/ |
/ua/ - under accreditation, within the scope of accreditation of the PT provider; /oa/ - out of the scope of accreditation of the PT provider
- “Invitation for participation” (QF 4.4-3) in MC 06/2023;
- “Application form” (QF 4.4-4) for MC 06/2023;
- "Detailed plan for proficiency testing (QF 4.4-1) - МС 06/2023;
Additional information regarding Interlaboratory Technical Project (ITP) MC 06/2023.
Deadline for accepting applications for participation: 31.08.2023;
• Payment deadline: 31.08.2023;
• Sending the samples to the participants: by 30.09.2023 at the latest;
• Conducting the tests: 06.11.2023;
• Preparation of the final report: no later than 12.12.2023;
Detailed information will be given in the instruction for conducting the interlaboratory comparison and proficiency test QF 4.4-5. You will be informed about all other changes that may be imposed during the course of MC 02/2023 by e-mail.
Please, in case you have any questions, do not hesitate to contact us via e-mails sslsb@abv.bg or sslsb@yahoo.com!
* The date indicated as the start of the respective project is also the date from which the acceptance of participation requests begins.
** Requests for the relevant project, in English and Bulgarian, can be found in the "PT schemes" section of our website: http://www.ptprovider.sslsb.org/