Home / PT Schemes / Interlaboratory technical project MC 12/2013 (Completed)
Test subjectCode of the standardName of the standardTested parameters* Beginning of the project** Acceptance of applications till*** End of the project
Asphalt mixturesEN 12697-6:2012, Procedure ВBituminous mixtures – Test methods for hot mix asphalt – Part 6: Determination of bulk density of bituminous specimensBulk density /ua/16.12.201315.03.201430.06.2014
EN 12697-5:2009, Procedure АBituminous mixtures – Test methods for hot mix asphalt – Part 5: Determination of the maximum densityMaximum density /ua/
EN 12697-8:2003, clause 4Bituminous mixtures – Test methods for hot mix asphalt – Part 8: Determination of void characteristics of bituminous specimensAir voids content /ua/
EN 12697-34:2012Bituminous mixtures – Test methods for hot mix asphalt – Part 34: Marshall testStability /ua/
EN 12697-34:2012Bituminous mixtures – Test methods for hot mix asphalt – Part 34: Marshall testFlow /ua/
Concrete products – Concrete paving blocksEN 1338:2003, Анекс FConcrete paving blocks – Requirements and test methodsTensile splitting strength /ua/
EN 1338:2003, Анекс EConcrete paving blocks – Requirements and test methodsWater absorption /ua/

Legend:

* The date which is pointed as a beginning of the relevant project is the date when acceptance of the applications starts.

** Application forms for the relevant project in English and Bulgarian may be found in the “ILC” section on our webpage: http://www.ptprovider.sslsb.org/

*** The end of the relevant project means that this is the deadline for the report to be prepared in case nothing else is stated in the instruction form QF 4.4-5.

/ua/ Under accredtitation (covered by the scope of accreditation)

/оа/ Out of accreditation (not covered by the scope of accreditation)

Note : All participants will receive further instructions for the process of implementing the relevant PT scheme. The minimum number of participants for a parameter to be included in the relevant PT scheme is 5.